JOB: Addition to an industrial plant, Allentown, Po.
MASONRY CONTRACTOR: C. B. HANEY CO., Bethlehem, Pa.
MORGEN
Morgen Scaffolding Lets 30 Masons Finish 2 1/2 Weeks Early on Estimated 12-week Job
To expedite the $225,000 masonry contract on an addition to an industrial plant in Allentown, Pa., the C. B. Haney Co. erected 115 towers of Morgen Adjustable Scaffolding to a wall height of 55' before any masonry work was started. This allowed the contractor to put his masons on the scaffold at the ground level and build the full wall without interruption, never having to shift men or material from one level to another. It eliminated the need for the usual scaffolding crew. All material was delivered directly to the material platform in 16" x 24" pallets.
This huge masonry job was completed in 9 1/2 working weeks instead of the 12 working weeks estimated to do the job, and this in spite of adverse winter weather.
Contractors who use Morgen Scaffolding consistently cut weeks from the job time, with resultant savings in wall cost, equipment rental and general overhead. It's time you see what it can do for you! Write for literature and complete details today.
MORGEN MANUFACTURING CO.
Box 159-P
YANKTON, S. D.
19