Masonry Magazine April 2004 Page. 31

Masonry Magazine April 2004 Page. 31

Masonry Magazine April 2004 Page. 31
MASONRY COMPUTER ESTIMATING

Now in 3D
by Tradesmen's Software

Masonry Computer Estimating
That Does It All... in 3D!

See the actual building being displayed in 3D as you do your take-off in either PLAN mode, PERSPECTIVE mode, OUTSIDE mode, INSIDE mode or at any ELEVATION. Complete your take-off, then walk through or around and see the actual finished building(s). SAVES - No more walls, bandings, openings or even buildings missed from your estimate. Figure special wall shapes like PIERS, GABLE, SLOPE or STEPS! Calculates CMU: HALF and FULL BULLNOSE, DOUBLE BULLNOSE, CHAMFER, or SASH for any or all OPENINGS, JAMBS, CORNERS, CONTROL JOINTS and any SPECIAL CUTS. Integrate with PROJECT COST and DIGITAL PLAN MEASURING SYSTEMS. Windows 98/NT/ME/2000 or XP compatible. 30 day money back guarantee.

Computer illiterate? Let our 40 years of masonry and 10 years of computer experience help you help yourself. Support available 7 days a week.

Tradesmen's Software, Inc.
1-800-494-4899
See for yourself at:
www.tradesmens.com

CIRCLE 163 ON READER SERVICE CARD
April 2004
Masonry 29

Exposed to fire, block doesn't burn, melt, twist or warp. And, after being blasted by a fire hose, block can be cleaned and repainted, while competing materials usually need replacement.

Flexibility
KRJ'S MASONRY DESIGN for the building takes into account the often unpredictable program changes that are sure to occur. "We're building in the capability for future wiring into the masonry with empty conduits and junction boxes with pull-wire where they can run cable or fiber optic wiring," says Anton.

Speed
ONE OF THE BEST-KEPT SECRETS about masonry is how fast it goes up. When Festus school officials moved the production schedule up by two months, their decision placed a heightened premium on speed of construction. To be able to meet or beat the tight deadline within budget, the decision was made to build with loadbearing construction techniques.

"As soon as the footings were in, we started laying masonry," says Dale Propst of Propst Masonry, the mason contractor on the job. "When we finished the first floor, the bar joists were there, and we moved on to the next floor. "It couldn't have gone any better," Propst states.

When people look at this building and the materials used versus other building materials, the quality of the project will be very evident." -Dr. Martin Boyer, Festus School District Asst. Superintendent

Paul Brockmiller, President of Brockmiller Construction and the project's general contractor, adds, "Loadbearing construction really allowed us to expedite our interior finishes. Once the block wall was scraped down and cleaned up, we were ready to paint."

Thanks to loadbearing masonry and everyone pulling together, the project sped along and the building was ready for the second semester.

"Masonry is what made the job," says Propst. "The masonry was done in time, and everything went well-a real win-win."

The Festus School District is especially happy, and with good reason. Not only was the new building completed two months ahead of schedule, but its masonry exterior and concrete block partition walls will be producing significant life cycle cost savings for decades to come.

Looking over all the benefits the district is going to receive by building with masonry, Dr. Boyer proudly summarized his satisfaction, saying: "I think that when people look at this building and the materials used versus other building materials, the quality of the project will be very evident."

The Voice of the Mason Contractor


Masonry Magazine December 2012 Page. 45
December 2012

WORLD OF CONCRETE

REGISTER NOW; RECEIVE A FREE HAT!
The first 25 people to register this month using source code MCAA will receive a free MCAA Max Hat (valued at $15.00)! The MCAA Max Hat features a 3D MCAA logo embroidered on front with a

Masonry Magazine December 2012 Page. 46
December 2012

Index to Advertisers

AIRPLACO EQUIPMENT
888.349.2950
www.airplace.com
RS #296

KRANDO METAL PRODUCTS, INC.
610.543.4311
www.krando.com
RS #191

REECHCRAFT
888.600.6060
www.reechcraft.com
RS #3

Masonry Magazine December 2012 Page. 47
December 2012

AMERIMIX
MORTARS GROUTS STUCCOS

Why Amerimix Preblended Products?

576

The choice is CLEAR:

Consistency

Labor reduction

Enhanced productivity

ASTM - pretested to ASTM specifications

Masonry Magazine December 2012 Page. 48
December 2012

MASON MIX
Type S Mortar
QUIKRETE
www.quikrete.com
800-282-5828

MASON MIX
Type 5 Mortar
COMMERCIAL GRADE
QUIKRETE

Our mortar mix on Vail's Solaris was so consistent, every bag was like the next. And the next