Masonry Magazine November 2006 Page. 20

Masonry Magazine November 2006 Page. 20

Masonry Magazine November 2006 Page. 20
Saws & Blades

machines can run through several tanks of gas before needing the air filter cleaned.

"One of the largest improvements is the maintenance it has actually gone down," Joynt said. "With masonry, the machine creates a lot of dust when grinding and it gets sucked into the air filter. The old machines needed more cleaning."

Still, a few quick, easy-to-do maintenance procedures can enhance the machine's performance.

"When you're running the machine, blow the dust off to keep it running cooler. If people would do that, it will help extend the life of the machine," Joynt said.

Daily saw maintenance should include checking the blade guard water tubes and fluid levels, checking the water pump, and cleaning the inner and outer collars, said Bob Coats, executive vice president for sales and marketing for DITEQ, in Lee's Summit, Mo. Weekly maintenance involves checking the belts and checking the blade shaft assembly.

Keep in mind: When a blade isn't cutting properly, the problem may be the saw, not the blade. "Problems with the saw can translate into problems with the blade," Coats said. "The most important thing when caring for the equipment is to keep it running clean and running true."

Also, when it's not in use, the fuel line on a gas machine should be completely

ON LARGE CONSTRUCTION JOBS, PLANNING IS EVERYTHING

Imagine this: You are the masonry contractor on a job that requires 750,000 hand-laid bricks and 1,000,000 architectural concrete masonry units to be fabricated or obtained, cut and laid in 18 months. Oh yes, and by the way, the structure you are helping to build is replacing an existing structure that must remain at least partially standing during the construction job because it will be in daily operation.

Quite a tall order! But it's one that MCAA member Heltkamp Masonry Inc. and a number of other St. Louis contractors found themselves confronted with when they landed the job of building St. Louis' new Busch Stadium. In 18 months, they not only had to build the new stadium, but the project also took place during baseball season.

The project was performed in two phases. The first entailed building as much of the new ball park as possible prior to the implosion of the old one. When the old Busch Stadium was imploded, the new in progress stadium (the second phase) was completed as rapidly as possible. At one point, the old and new structures were only a few feet apart.

Heitkamp Masonry was responsible for the brick and concrete work for the stadium, including restrooms, concessions and outbuildings, as well as the granite, paving and precast work.

How did they pull it off? According to Heitkamp Masonry's Project Manager, Geoffrey Hart, it's all in the planning, "The logistics on a job like that are incredible. It takes about a year of pre-planning before the job, then 10-to 12 hour-a-day supervision while the job is in progress."

Planning Supported by Suppliers

To support the planning and to keep a job of this nature on track, the contractor's suppliers must be very responsive. Once the Busch Stadium job started, tools and supplies were required on a daily basis. Because of the tight time frame, response had to be near instant. Hart credits Bill Brennan and his company, Brennan Tools and Fastening Systems, who had representatives on-site constantly to ensure Heitkamp Masonry and other contractors had everything they needed.

During construction, Brennan Tools was able to consistently deliver items right to the job within 24 hours of being ordered. It even had secure on-site containers where materials could be placed for later shifts, so that second and third-shift deliveries weren't necessary.

"Bill was really a great resource, simply because he was so close to the project," Hart said. "This was mainly because his representatives were down there always to respond to anything we needed at a moment's notice."

A Saw Blade Proves the Point

Much of the work being done at Busch Stadium was indoors, and this presented an immediate problem for Hart and his workers. Heitkamp Masonry was not the only contractor working on this project, and the saws used for cutting masonry are notoriously loud.

Because of their noise level, masonry saws must typically be used some distance from the work being performed, out of safety concern for other tradespersons on the job site.

Early on in the Busch Stadium job, Brennan saw the problem of the tight time schedule and realized that Heitkamp Masonry could not afford to have its saws located a distance away from the job. Brennan knew that Target had a fairly new silent core masonry diamond blade on the market that would reduce the usual screeching noise level to nearly zero, making it possible to work close to the job without adversely affecting the hearing of those around the site.

"I knew how effective the Silent Runner blades were, so I bought the first blade myself and gave it to Heitkamp to try out," Brennan said. "Heitkamp was open to the idea, but skeptical at first. There has been a lot of advertising about 'quiet blades' and contractors are like, "Yeah right, how quiet is quiet?"

Because the Silent Runner blade works by resonating inside the blade instead of outside, the high degree of noise normally inherent with such blades is eliminated. Also, it performs as well or better than standard diamond blades, with no loss of performance.

"They tried it and said it was spectacular," Brennan said.

"When you've got a guy on the job eight hours a day, the less noise the better," Hart said. "It really helped us. It was certainly a silent blade, and didn't give off the sharp, piercing noise that a regular blade would. It kept the contractors working around us very happy."

The careful preparation, fantastic supplier support and smooth supervision paid off. The new Busch Stadium was completed within its near-impossible target date and opened on April 10, 2006, as the St. Louis Cardinals took the field against the Milwaukee Brewers. Though most fans will never know it, it all came about through detailed planning, well executed by contractors such as Heitkamp Masonry and supported by suppliers such as Brennan Tools and Fastening Systems.


Masonry Magazine December 2012 Page. 45
December 2012

WORLD OF CONCRETE

REGISTER NOW; RECEIVE A FREE HAT!
The first 25 people to register this month using source code MCAA will receive a free MCAA Max Hat (valued at $15.00)! The MCAA Max Hat features a 3D MCAA logo embroidered on front with a

Masonry Magazine December 2012 Page. 46
December 2012

Index to Advertisers

AIRPLACO EQUIPMENT
888.349.2950
www.airplace.com
RS #296

KRANDO METAL PRODUCTS, INC.
610.543.4311
www.krando.com
RS #191

REECHCRAFT
888.600.6060
www.reechcraft.com
RS #3

Masonry Magazine December 2012 Page. 47
December 2012

AMERIMIX
MORTARS GROUTS STUCCOS

Why Amerimix Preblended Products?

576

The choice is CLEAR:

Consistency

Labor reduction

Enhanced productivity

ASTM - pretested to ASTM specifications

Masonry Magazine December 2012 Page. 48
December 2012

MASON MIX
Type S Mortar
QUIKRETE
www.quikrete.com
800-282-5828

MASON MIX
Type 5 Mortar
COMMERCIAL GRADE
QUIKRETE

Our mortar mix on Vail's Solaris was so consistent, every bag was like the next. And the next