Cavity Wall: Concrete Block Veneer/Steel Stud

This versatile wall system features a durable, low-maintenance masonry façade with a steel structure.

Cavity Wall:  Concrete Block Veneer/Steel Stud
Coping and steel stud parapet Relieving angle and flashing at opening Wall ties attached to sheathing and steel studs Flashing at base of wall

Recommended Building Types

Benefits

  • Looks like a solid masonry building but a steel stud backup system usually costs less
  • Many of the benefits of a masonry façade: durability, low maintenance, high fire rating, and numerous design choices
  • Drainage cavity keeps building interiors dry

Special Considerations

  • Steel studs flex more than the masonry veneer – this can lead to cracks developing in the masonry unless the studs are designed to strict deflection tolerances
  • Concrete block veneer shrinks as it ages. It needs control joints at 24'-0" o.c. max
  • Volatility of steel prices makes it difficult to predict final project costs
  • Multiple trades involved, which makes jobsite coordination more difficult
  • Tolerances for steel erection are looser than those for masonry – which can lead to conflicts during veneer construction
  • Steel studs can corrode if water penetrates past the drainage cavity or due to condensation
  • Interior surfaces (drywall) are prone to vandalism and damage in heavy traffic areas
  • There is a potential for mold growth on sheathing unless mold-resistant sheathing is used

Definition and Assumptions

Backup: 16 gauge x 6" deep Steel studs @ 16" on center. Fiber batt insulation between studs.

Sheathing
: 5/8" exterior grade gypsum board, screwed into studs. Weather resistive barrier over sheathing.

Veneer: 4" concrete block (CMU) veneer, plain gray smooth face

Cavity: 2 inch air space

flashing: Base flashing and weeps

veneer ties: Adjustable veneer ties screwed into studs

Spacing: 16" vertical x 16" horizontal

Veneer reinforcement: 9-gauge ladderjoint reinforcement at 16" o.c.

Shelf angle: At floor lines, for veneer heights greater than 30 feet

mortar: Type N, Portland cement/lime, plain gray

Joints: Concave tooled

Regional Variations

  • When masonry veneer is used in areas of high seismic risk, veneer ties are required to attach to wire reinforcement embedded in mortar bed joints in the veneer. Check your local requirements – and save money by using normal veneer ties in areas of low seismic risk.
  • Many areas of the western U.S. have good local sources for lightweight aggregate, and the use of lightweight concrete block (CMU) is the norm. In other parts of the country, medium weight and normal weight block are more common.
  • Understand that some form of horizontal reinforcement is required in all concrete masonry construction, including veneer applications.

Fire Rating (hours)

1 hour

Sound Transmission Class (dB)

STC 56

Wall Weight (lb/sq. ft.)

30 lb/sq. ft.

Energy Rating

R-value: 22.9 with 6” fiber batt insulation

Calculation:

Outside Air =0.17
4 inch CMU =1.19
Air Gap =0.97
Gyp board =0.45
Gyp board =0.45
6 inch batt insulation =19.00
Interior Air =0.68
Total =22.91

Green/LEED Rating

Design Tips

  • Use insulation that is installed in the cavity whenever possible: it is nearly continuous and is much more effective than insulation installed between the studs. Studs provide a direct thermal path through the wall and reduce insulating efficiency. Studs are denser than the insulation and the cold travels through the studs and ignores the insulation. This phenomenon can reduce the insulating capacity of a wood stud wall by 40% and by 60% when Steel studs are used.
  • New requirements in energy codes may require that you use rigid insulation in the veneer drainage cavity when the structural backup is built of wood stud or steel stud. If your construction project is subject to the International Energy Conservation Code (IECC) or the requirements of ASHRAE-2004 or ASHRAE-2007, you might be required to also install a continuous layer of insulation to this wall. IECC requirements vary by climate, so make sure you understand local conditions and what energy code is relevant in your area.
  • Use galvanized hardware(including screws) for masonry veneer ties to minimize corrosion potential.
  • Design the steel stud backup to a deflection limit of L/720 to minimize veneer cracking.
  • Tighten up the tolerances for steel construction to match those for the masonry veneer. Some of the difference can be taken up in the drainage cavity but there can also be significant conflicts between the steel erection and masonry trades.
  • Design relieving angles at each floor line for multi-story buildings to permit the brick veneer to expand independently of the backup.
  • shelf angles may not be required for veneer support at every floor line. Cut down on the number of shelf angles to save money and simplify your construction. If your veneer is shorter than 30 feet above the top of the foundation wall, you may not need relieving angles at all.
  • Attach windows and doors to the structural Steel studs, not the masonry veneer.
  • Make sure you have at least ¾" overlap of the door and window jambs onto the brick veneer. Install backer rod and sealant around all openings.
  • You must use sheathing to face the steel stud wall at the drainage cavity.
  • Use building paper to cover the sheathing, or use a water resistant sheathing with taped joints.

Construction Tips

  • Meet with the general contractor early in the project to make sure the steel erector understands masonry construction tolerances
  • Anchor veneer ties into the steel stud using galvanized screws. Anchorage into sheathing alone is not permitted
Approaching Restoration as a Mason Contractor

As buildings age and their surrounding areas develop, masonry contractors may be approached to restore, repair, and reconfigure existing masonry on projects outside the typical scope of a new construction commercial project. Restoration of older masonry b

About: Featured
Marketing Strategies for Equipment Manufacturers: Insights from EZG Manufacturing

With over 25 years of experience in manufacturing and distributing equipment across all seven continents, EZG Manufacturing has developed a strong understanding of successful market positioning. Drawing from this extensive experience, we’re sharing effect

Building More: How Can They Do It For That Price?!

Spring is a weird bid season. Estimates are coming in all over the place. It seems like everyone has tightened their belts to land what they can as we come out of the election cycle slowdown. We are no exception. Lowering margins is a temporary solution,

About: Featured
MASONRY STRONG Podcast, Episode 14 Recap: Foreman Instructors

On this episode of the MASONRY STRONG Podcast, Foreman Instructors Donnie Williams, Jameel Ervin, and Tom Vacala join Justin in talking about the changes in masonry education over the years, how they all became good friends, and some of their favorite sto

About: Featured