Masonry Magazine October 1982 Page. 37

Words: Howard Jenkins, Don Zimmerman, Robert Hunter
Masonry Magazine October 1982 Page. 37

Masonry Magazine October 1982 Page. 37
disputes between the Laborers and the Operating Engineers over

disputes between the Laborers and the Operating Engineers over the operation of forklifts in connection with masonry work at various construction sites throughout the State of Wisconsin. The work was awarded to the Operating Engineers in all of the decisions, and it is therefore the contention of the Operating Engineers that this factor favors an award of the disputed work to employees whom it represents.

On previous occasions the Board has refused to accord significant weight to such awards when they fail to explicate the factors upon which they are based. In the instant case the awards consist of brief letters which rely on either the 1954 agreement between the two Internationals, discussed supra, or a 1907 decision apparently made by the American Federation of Labor. The letters do not set forth any other factors as a basis for the award. As indicated above, we do not attach any weight to the 1954 memorandum of understanding, and the record sheds little light on the 1907 decision by the American Federation of Labor. Moreover, we note that the Employer is not obligated to submit any dispute to the Impartial Jurisdictional Disputes Board, and the decisions submitted in evidence are not binding on the Employer. We therefore accord the decision no weight in determining the award of the disputed work.

7. Employer preference

The Employer originally assigned the disputed work to employees represented by the Laborers, and it has expressed its clear preference that the disputed work be awarded to those employees. Accordingly, we find that this factor favors an award to employees represented by the Laborers.

Conclusion

Upon the record as a whole, and after full consideration of all relevant factors involved, we conclude that employees who are represented by the Laborers are entitled to perform the work in dispute. We reach this conclusion relying on the factors of the collective-bargaining agreements, employer practice, and employer preference. In making this determination, we are awarding the work in question to employees who are represented by the Laborers, but not to the Union or its members. The present determination is limited to the particular controversy which gave rise to this proceeding.

DETERMINATION OF DISPUTE

Pursuant to Section 10(k) of the National Labor Relations Act, as amended, and upon the basis of the foregoing findings and the entire record in this proceeding, the National Labor Relations Board hereby makes the following determination of dispute:

1. Employees of McWad, Inc., who are represented by Laborers International Union of North America Local 1359 are entitled to perform the work of operating forklifts and skid loaders used in connection with McWad, Inc.'s masonry work at the construction site of the Employer's Insurance of Wausau Training Center in Wausau, Wisconsin.

2. International Union of Operating Engineers, Local No. 139, is not entitled by means proscribed by Section 8(b)(4)(D) of the Act to force or require McWad, Inc., to assign the disputed work to employees represented by that labor organization.

3. Within 10 days from the date of this Decision and Determination of Dispute, International Union of Operating Engineers, Local No. 139, shall notify the Regional Director for Region 30, in writing, whether or not it will refrain from forcing or requiring the Employer, by means proscribed by Section 8(b)(4)(D) of the Act, to assign the disputed work in a manner inconsistent with the above determination.

Dated. Washington, D.C. July 27, 1982

Howard Jenkins, Jr.,
Member

Don A. Zimmerman,
Member

Robert P. Hunter.
Member

NATIONAL LABOR RELATIONS BOARD
SEAL



ANCHOR "Hy-Dump"
Low Charge 38"- High Discharge 35" 12 cu. ft. capacity
Power Dump

Dealer
Inquiries
Invited

Anchor

Designed especially to provide a low charging height and a high discharge height coupled with a power dump. A fast mixing machine capable of dumping into wheelbarrow, concrete buggy or mortar pump.

For information, phone (312) 247-2530 or write
ANCHOR MANUFACTURING CO.
2922 W. 26th St.. Chicago, III. 60623



ORIGINATORS OF
Pre-Fabricated Glass Block Panels

CUSTOM MADE TO YOUR REQUIREMENTS
NATIONAL DISTRIBUTOR
PITTSBURGH CORNING
SCHALKE GLASS BLOCK-GERRIX HOLLOW
GLASS BLOCK

MANY STYLES AND SHAPES

SASH REPLACEMENT

SPECIALISTS IN THE INSTALLATION OF
GLASS BLOCK

FRED BEYER
Since 1910
7810 S. Claremont Chicago, III. 60620
(312) PR 8-4300


What Is Biophilic Design?
April 2025

Biophilic design integrates natural elements into built spaces to fulfill our innate connection to nature. Rooted in the biophilia hypothesis, it goes beyond aesthetics, enhancing well-being, health and productivity. 5 Ways to Incorporate Biophilic Desig

One For The Ages - The 75th Midyear
April 2025

“One for the ages” this is how I would describe the upcoming midyear to anyone who has never attended or are undecided about attending MCAAs 75th Anniversary at The Grand Hotel on Mackinac Island September 7-11 2025. In short “one for the ages” means so

A Greener Future Through Masonry
April 2025

When it comes to building a more sustainable future, the construction and building materials sector has a lot of room for growth. According to the most recent data, construction and building-related emissions are responsible for 40% of greenhouse gas emis

MASONRY STRONG Podcast Episode 19 Recap: Mike & Tom Finch
April 2025

On this episode of the MASONRY STRONG Podcast, Mike and Tom Finch join the set in Indianapolis to crack jokes, talk about how they both got started in this industry, and the ways they've seen this trade advance and evolve over the years. The Roots of a F