Masonry Magazine March 2009 Page. 39

Masonry Magazine March 2009 Page. 39

Masonry Magazine March 2009 Page. 39
SCAFFOLDING PLANK SAFETY

PLANK SAFETY REQUIRES INSPECTION AND CARE. Several organizations have published "controlling documents, including OSHA Safety and Health Standards and the Scaffolding Industry Association (SIA), with the most binding being those from OSHA. Sort through the legalese and technical jargon, and you're left with simple, common sense things to consider on the jobsite and in the yard.

Inspection is critical, and both OSHA and SIA say an inspection must be done by a qualified person meaning "one who, by possession of a recognized degree, certificate or professional standing or by extensive knowledge, training and experience, has successfully demonstrated the ability to solve or resolve problems relating to the subject matter, the work or the project." Most contractors have at least one such person on staff - whether it's the owner, a long-time supervisor, or someone who has been sent for specialized training in safety issues.

Although the rules call for a qualified person to perform inspections, the reality of life on the job indicates that anyone who steps a foot on a scaffolding plank must know enough to say if the rig is safe. For these daily ad hoc inspections, the worker can use guidelines and common sense equally well. Several companies that manufacture scaffolding planks produce detailed guidelines for selecting the right planks and simple, but complete, guides for field care and inspection.

McCausey Lumber Co. in Roseville, Mich., and Kennison Forest Products, in Sulphur, La., are examples of companies with guidelines available to clients and non-clients. Like you, these companies are concerned about job safety and the proper use- and avoidance of misuse of their products.

"When in doubt, kick it out."
- Kennison Forest Products

KENNISON FOREST PRODUCTS, INC.

The Solid Choice for Scaffold Plante

Dense Industrial 65 Solid Sawn Scafold Plank

Z-Plank Laminated Scaffold Plank

Services Available:
Rod-Clip-Brand
End Painting
Precision End Trimming

Meets OSHA/ANSI Standards
Smooth and Rough Surfaces
2x10", 2x12"
2'-16' Lengths

Call today for delivered prices to your area on partial or full loads!

Call Our Sales Team!
1-888-697-5585
Fax: 337-527-0412

Bob Edens
Sales, ext. 17
Jared Kennison
Sales, est. 15

Joe Kennison
Sales, est. 14

John Warlikowski
Western Region Sales
1-877-784-9163
www.kennisonforest.com

READER SERVICE #144

NEED PLANK? TAKE ADVANTAGE

SCAFFOLD PLANK MEETS OS

Quality Scaffold Plank
Competitive Prices
LVL or Solid Sawn
Full or Partial Truckloads
Rod-Clip-Custom Branding
Service Available 24-7-365!

ADVANTAGE
LUMBER CO.

RIC FONTENOT
phone 866.480.6516
fax 337.480.6582
cell 337.540.9847

ELRIDGE SCHWARTZENBURG
phone 877.612.3656
fox 337.948.7010
enal:
advantagelumber@yahoo.com

READER SERVICE #274
March 2009
MASONRY 35


What gives with head protection? Why workers want to keep their hard hats and ditch safety helmets.
April 2025

Last August, I took my pickup to the dealership for a nagging check engine light. While it was being looked over, I chatted with the salesman I normally deal with, and he told me about the latest and greatest 2025 models. He told me how the twin turbo inl

Government Affairs: Bringing North Carolina to Washington, D.C. and Hopefully Young People to Your Jobsites
April 2025

For you long time members of the Mason Contractors Association of America you likely remember our Annual Washington, D.C. Fly-In where MCAA members from around the country would come to Washington, D.C. meeting with Members of Congress from their home sta

Chairman's Message: While We Are Still Here
April 2025

I truly value my days working on construction sites during the summers of my high school and college days. Some moments in our youth are so clearly meaningful that we file them away in our subconscious to be recalled when life events require inspiration.

Contractor Tip of the Month: The Tough Calls That Define a Leader
April 2025

In construction, every project balances a delicate trio: coordination, precision, and timing. However, beyond blueprints and schedules, leadership demands something far greater—the ability to lead and make difficult decisions that shape the future of a co