CHIMNEYS AND FIREPLACES

A fireplace is added to the Phase 2 Qualified fireplace list.

Emissions are tested under ASTM E-2558, the industry standard for particulate emission testing of wood-burning fireplaces.

The intent of the Voluntary Fireplace Program is to reduce wood smoke emissions from fireplaces more quickly than what could be achieved through federal regulation.

In 2010, and in the opening months of 2011, it was expected that federal regulation would be used to reduce wood smoke emissions through the inclusion of wood-burning fireplaces in the Federal New Source Performance Standard (NSPS) revision. However, with input from industry representatives and the Hearth Patio and Barbeque Association, the EPA ultimately decided, in spring 2011, to exclude wood-burning fireplaces from the NSPS. Had they been included, the construction and installation of new fireplaces, nationwide, would have been limited to those meeting established emission standards.

Though now not included in the standard, wood-burning fireplaces still may contribute to nonattainment of air quality goals in certain regions of the country. These regions, once predominantly or exclusively in Western states, now are found throughout the country, including, but not limited to, areas of the Midwest and New England states. Construction of EPA Phase 2 Qualified Fireplaces instead of the construction of conventional fireplaces can help reduce the health risks of wood smoke emissions from new fireplaces.

Air quality districts across the country are tasked with achieving air quality goals. The methods used to achieve those goals are left to the discretion of the district. With regard to wood-burning fireplaces, some districts have developed their own emission standards and, in some instances, banned the construction or installation of new fireplaces completely.

The establishment of the EPA-Qualified Wood-Burning Fireplace Program creates a framework that may be adopted by air quality districts faced with nonattainment of air quality goals. Districts may introduce more stringent regulations. But, with the EPA program in place, it is hoped that those areas faced with the necessity of reducing wood

Product Watch

Natural Stone Fireplace Surround With One-Hour Install

For contractors, installing a cast stone fireplace in a residence, condo or apartment building can present so many labor and material costs - not to mention installation issues that it can scuttle a job completely before it even begins.

In one way or another, the difficulties behind cast stone surrounds stem from its sheer weight. A cast stone mantel and surround can weigh up to 1 ton. Shipping alone for a surround of this size can cost $800 or more, in addition to the cost of the product itself. Also, given the product's weight, floors and walls often require additional structural support, driving up installation time and costs. In fact, structural issues can eliminate effectively cast stone surrounds as an option for any floor higher than the first, and for most apartment or condo units.

The weight of cast stone also is a factor in the actual installation. Contractors must use lifting equipment to bring the material indoors and during installation, and employ multiple helpers. All totaled, a cast stone surround installation can take up to two days.

Fortunately, a new option on the market that takes a lot of the cost, weight and installation time out of such a project exists. To be more exact, installing a stone surround can take as little as one hour, with a single helper, no structural reinforcements, using only a level, caulking gun, a sponge and, perhaps, some shims.

The solution is a lightweight product that has the look and feel of real stone, but isn't as heavy as solid cast stone. To be more exact, the product, from San Antonio-based Mission Stone, involves a layer of cast limestone cement over a lightweight Styrofoam core, giving the look and feel of solid cast stone without the weight, the price or installation requirements.

Mission Stone uses actual stone, but just on the surface of the product. A half-inch-thick layer of limestone cement is hand cast around the foam core and, subsequently, hand-polished with a grinder to give it the look and feel of real cast stone. At that point, the surface presents a white color, but various water-based stains can be applied to provide different color variations, including custom finishes.

Perhaps most important, the fireplace surround with its foam core greatly reduces the weight from about 2,000 pounds for cast stone to only 200 pounds, for the average mantel and two legs.

The legs and mantel are first "dry-fit" to the wall, and their positions are marked in pencil. The pieces then are removed, so that the adhesive can be applied, after which they are pressed firmly back into place. Once the adhesive is dry, a 1/8-inch bead of caulk is applied where the mantel and legs meet the wall. Wiping everything down with a clean damp sponge finishes the job.

If time is money, foam-core technology also saves when it comes to manufacturing lead times. A cast solid stone order can require anywhere from six to eight weeks to fill. A foam-core order takes three to four weeks to fill a notable time savings.

For more information, visit www.missionstone.com.

The establishment of the EPA-Qualified Wood-Burning Fireplace Program creates a framework that may be adopted by air quality districts faced with nonattainment of air quality goals.


What gives with head protection? Why workers want to keep their hard hats and ditch safety helmets.
April 2025

Last August, I took my pickup to the dealership for a nagging check engine light. While it was being looked over, I chatted with the salesman I normally deal with, and he told me about the latest and greatest 2025 models. He told me how the twin turbo inl

Government Affairs: Bringing North Carolina to Washington, D.C. and Hopefully Young People to Your Jobsites
April 2025

For you long time members of the Mason Contractors Association of America you likely remember our Annual Washington, D.C. Fly-In where MCAA members from around the country would come to Washington, D.C. meeting with Members of Congress from their home sta

Chairman's Message: While We Are Still Here
April 2025

I truly value my days working on construction sites during the summers of my high school and college days. Some moments in our youth are so clearly meaningful that we file them away in our subconscious to be recalled when life events require inspiration.

Contractor Tip of the Month: The Tough Calls That Define a Leader
April 2025

In construction, every project balances a delicate trio: coordination, precision, and timing. However, beyond blueprints and schedules, leadership demands something far greater—the ability to lead and make difficult decisions that shape the future of a co