Words: George HedleyConstruction is a difficult business, with lots of moving parts. On every project, there are 5,947 chances for things to go wrong. Contractors find themselves at the mercy of project plans, changes, payments, scheduling, weather, labor, equipment, materials and deliveries. So much is out of their control. At the end of every job (when it’s too late to do much about it), the bottom-line reality of what the project manager, superintendent or foreman has or, more typically, has not done, to manage the contract properly becomes apparent. Not paying attention to key contract clauses about notice, documentation and change order procedures is a sure way to watch your profit dwindle.

Contracting is about contracts

Most contractors don’t like paperwork. But, unfortunately, contracting is about contracts, and contracts are paperwork. As much as 50 percent of all profits made or lost on construction projects can be as a result of managing the contract properly. The contract or subcontract defines how you must do business with your customer. Too many contractors and subcontractors sign pre-prepared five-, 10-, 15- or 20-page contracts without reading them or having their attorney review them, or without understanding the specific contractual requirements.

Did you notice?

One of the first things to look for when reviewing your contract is: What requires notice? “Notice” is proper notification to your customer about a change, conflict, incident, omission or problem, within a specified number of days, and in a specified format (usually in writing). Before you start a project, review the contract and prepare a chart listing items that require proper notice.

WIN with no VAs

In the construction business, you must use the slogan: WIN = Write It Now. Phone calls, meetings or meeting minutes are not proper notice or documentation. Another saying we enforce is no VAs = no Verbal Agreements. Verbal agreements aren’t worth the paper they’re written on.

Be complete

Assembling all documentation, paperwork, change order requests, notices and information required by your contract often seems overwhelming. But once you get in the habit of following the contract, it becomes easy and a normal part of your construction routine. In order to get everything you deserve while building a project for your customer, you must be timely in your requests. Missing the notice time requirements may result in a loss of your right to collect for things out of your scope of work or control. When documenting items, take a little extra time and be complete in your description of the event.

By not documenting conflicts or changes in a timely and complete manner, contractors inadvertently shift more responsibility onto their own shoulders and can lose the right to collect. Providing proper notice starts at the beginning of every project. Meet with your customer to discuss the contract terms and what it requires. Review and agree on the project notice and documentation required for every conflict or change. And then, be ready to follow the contract.
MASONRY STRONG Podcast, Episode 24 Recap: Gary Hensley, VP of Sales at Oldcastle Adams
July 2025

On this episode of the MASONRY STRONG Podcast, Gary Hensley joins Justin in Indianapolis to talk about his story within the masonry industry, how he got started, how he's seen it evolve, and where he sees it going. Why the Masonry Industry? Concrete and

The Enduring Power of Structural Masonry
July 2025

Masonry has been holding its ground for millennia — literally. And thanks to the simple brilliance of arching action, it continues to do so with strength, style, and surprising efficiency. In an era of advanced modeling and fast-moving schedules, one time

Building More: Slow, Fast, or Consistent. What is Tempo?
July 2025

It was a drizzly midweek day when I rolled up to the project we were working on just outside of town. The foreman paced the scaffolding, rain hood half-zipped, barking at two laborers who were sprinting bricks like they were late for a flight. Forty feet

Marvelous Masonry: Belém Tower
July 2025

The Belém Tower in Lisbon, Portugal, stands as a testament to stone construction's enduring artistry and technical prowess. Erected between 1514 and 1519, this iconic structure served as a defensive bastion at the mouth of the Tagus River and as a ceremon