Conclusions

After considering all the relevant factors, we conclude that employees represented by Laborers' International Union of North America, Construction General Laborers, Local 373, AFL-CIO are entitled to perform the work in dispute. We reach this conclusion relying on the Employer's assignment and preference, industry practice, and economy and efficiency of operations. In making this determination, we are awarding the work to employees represented by Laborers, not to that Union or its members. The Employer contends that the Board should issue a broad award to employees Laborers represents on Friday's jobsites throughout western Pennsylvania. We conclude that a broad offer is not warranted. Operating Engineers did not engage in threats of picketing or picketing; rather, it was the Laborers that threatened to picket and shut down the Mobay project to maintain assignment of the disputed work to employees it represents. In these circumstances there is no basis for extending the determination beyond the particular controversy that gave rise to this proceeding.

DETERMINATION OF DISPUTE

The National Labor Relations Board makes the following Determination of Dispute. Employees of R. G. Friday Masonry, Inc. represented by Laborers' International Union of North America, Construction General Laborers, Local 373, AFL-CIO are entitled to perform the Pettibone or high-lift forklift work at the Mobay Corporation project on Mobay Road in Pittsburgh, Pennsylvania.

Dated, Washington, D.C. May 31, 1988

(SEAL)
James M. Stephens,
Chairman
Wilford W. Johansen,
Member
Mary Miller Cracraft,
Member
NATIONAL LABOR RELATIONS
BOARD

Laborers Local 1086 (Dentinger, Inc.), 282 NLRB No. 90 (Jan. 6, 1987).



Bilax PRESENTS EQUIPMENT FOR THE CONTRACTOR



SCAFFOLD & SHORING
EQUIPMENT
BUILDING SYSTEMS
MATERIAL HOISTING
EQUIPMENT

• Long Life
Since 1947
• Complete
Line
• Heavy-Duty/Sturdy
• Competitive Pricing
• Contractor Tested
THE LOW COST,
FLEXIBLE SOLUTION
TO YOUR TEMPORARY
ENCLOSURE NEEDS!
Storage Area
Maintenance/Repair
Scaffold Enclosures
Weather Protection
• Heights
to 300
Capacity
to
5,000円
• Gas,
Electric, or
Diesel Drive



Bil-Jax
SCAFFOLDING &
EQUIPMENT CO.
Panel-Tek
BUILDING SYSTEMS CO
BUCK
HOIST CO.



FOR MORE INFORMATION, CONTACT BIL-JAX, INC., ARCHBOLD, OH 43502
PHONE: (419) 445-8915



MASONRY-SEPTEMBER/OCTOBER, 1988 23


Business Building: Top Field Systems To Achieve Results!
May 2025

To be successful in the construction business, you must achieve the field results you want to achieve. Therefore, what systems and standards do you have, maintain, train, and enforce which will almost certainly guarantee you will finish your jobs on time,

Marvelous Masonry: The Technical Administration Building, Frankfurt, Germany
May 2025

The Technical Administration Building in Frankfurt, Germany, is a testament to masonry construction's craftsmanship and durability. This iconic structure reflects the architectural trends of its era and serves as a case study in masonry preservation and r

Contractor Tip of the Month: Making Yourself Available for What Matters Most
May 2025

Your responsiveness is a key factor in achieving success in your career. Opportunities don’t wait, and neither do customers, employees, or critical decisions. Prioritizing accessibility, especially during pivotal moments, can be the difference between sec

Fechino Files: Differences
May 2025

I recently traveled to a city where I met with several contractors. After we talked a bit, several of the folks showed me around their places, and I saw two different ways of thinking based on the employees' personalities. I am sure you are wondering wher