BEST PRACTICES
By Diane Haines

The Arrival of Integrated Project Delivery
Historically, the building process has been extremely fragmented, with architects, designers, contractors and subcontractors working independently. In the last few years, the need for increased collaboration has come to the forefront as a means to reduce waste, minimize construction delays and achieve greater efficiency in the execution of building projects. Integrated Project Delivery (IPD) is a collaborative delivery model that encourages greater communication between architects, contractors and subcontractors at each stage of the building process, from pre-construction to post construction.

New construction industry trends such as the use of building information modeling (BIM) and other technological developments, as well as owners' demand for more value for their money, have driven the adoption of IPD. Owners have become increasingly dissatisfied with the demand-bid-build process, and many have pushed for more collaboration. The process can't stop with asking building teams to collaborate; they need to implement a new system and new tools, which will facilitate their new dynamic. IPD is a system that supports collaboration, and it can be supported with tools such as document management software, which improves communication and provides access to real-time data for all of the teams involved in the building process.

Project management flaws associated with the demand-bid-build process
In 2004, the National Institute of Standards and Technology found that the construction industry loses as much as $16 billion every year, due to fragmented software systems. Additionally, a 2004 Construction Industry Institute and Lean Construction Institute study shows that 57 percent of the time, effort and material spent on building projects did not add value to the final project, while 26 percent of the manufacturing sector's operations added no value. This lack of efficiency is the result of the waste associated with the traditional demand-bid-build process.

This process featured fragmented, hierarchical teams that only shared information on a need-to-know basis and, because compensation was allocated separately, individual teams were more likely to put in the least effort needed for the greatest return. Replacing fragmented teams with a collaborative process, IPD encourages the sharing of important information, as well as the sharing of risk. This keeps all of the teams highly invested in a project, since all of their reputations are at stake. This system is more likely to result in a valuable final product, while using fewer resources, thanks to more efficient communication. Furthermore, the traditional project delivery model relied on paper-based documentation, unlike IPD, which incorporates advanced technology systems that help building teams work better and faster and waste fewer resources.

Maximizing collaboration with IPD
The IPD model revolves around uniting all of the parties involved in a building project as early as possible, including designers, architects, contractors, subcontractors and the future owner of the building. This increased collaboration has changed the contract process for many IPD projects. Multi-party contracts legally require all teams involved in the project to share both risk and compensation, encouraging them to provide a product of better value in order to get a larger reward. Thus, when a problem arises, the teams involved in the project won't be worried about assigning blame and will be more motivated to fix the issue as a collective unit, instead of individually. IPD projects include a unique legal relationship between teams, a no-blame work environment, integrated leadership, lean construction, collaboration software, and design assistance. In the end, the collaboration facilitated by IPD restructures business relationships within a building project, eliminating the adversarial elements and replacing them with a dynamic of shared risk and reward.

The American Institute of Architects and the Associated General Contractors of America have been working to develop new contract documents that meet the standards of IPD. The new delivery model comes with new legal liabilities and new responsibilities, but the establishment of shared risk should actually lower the legal risks, compared to the traditional delivery model.

Using technology to automate collaboration
One of the main tools that has enabled the increased adoption of the IPD approach is BIM technology. BIM allows everyone involved in a building project to see the design at it is developed, creating an environment open to collaboration. While the designer begins the plans for a project, contractors and building owners can review the virtual


Ensuring Stability and Safety in Masonry Projects: Hog Leg, Hog Guard, and Hog Support
April 2025

As seasonal changes bring high winds and fluctuating temperatures, masonry projects face unique challenges. These conditions can stress vertical structures, requiring reliable bracing, while temperature swings may lead to a need for masonry restoration. A

What gives with head protection? Why workers want to keep their hard hats and ditch safety helmets.
April 2025

Last August, I took my pickup to the dealership for a nagging check engine light. While it was being looked over, I chatted with the salesman I normally deal with, and he told me about the latest and greatest 2025 models. He told me how the twin turbo inl

Government Affairs: Bringing North Carolina to Washington, D.C. and Hopefully Young People to Your Jobsites
April 2025

For you long time members of the Mason Contractors Association of America you likely remember our Annual Washington, D.C. Fly-In where MCAA members from around the country would come to Washington, D.C. meeting with Members of Congress from their home sta

Chairman's Message: While We Are Still Here
April 2025

I truly value my days working on construction sites during the summers of my high school and college days. Some moments in our youth are so clearly meaningful that we file them away in our subconscious to be recalled when life events require inspiration.