Masonry Magazine November 2011 Page. 28

Words: Meredith Ware, Bryan Simon, Adam Werbach
Masonry Magazine November 2011 Page. 28

Masonry Magazine November 2011 Page. 28
GREEN BUILDING

Bonsal did, however, make smart adjustments elsewhere in the transportation system by optimizing full-load and back-load shipping; switching long-haul shipping to fuel-efficient rail cars or barges; and installing engine idling alerts on trucks. Just this year, an Oldcastle plant in Florida celebrated 1 million rail car shipments. That's a lot of unused diesel fuel.

Ware, a LEED AP, also helps the executive team equip their divisions, such as Amerimix, ProSpec and Sakrete, with the tools they need to be a part of the industry's transition to responsible products required by green building programs. She recently offered a LEED Green Associate class to any Bonsal employee who was interested.

"The room was packed; we had to pull in extra chairs," says Ware. The class was attended by project managers, chemists, marketers, sales staff and VPs. And, the good news is that many of the employees continued their studies to pass their LEED Green Associate exam.

"Today, it almost a requirement in the building industry to have some sort of knowledge about how green building programs work," Ware says. "After all, green building is the only building sector that continues to grow, despite the declining environment."

Fast forward: How does Bonsal get products under the nose of LEED AP architects and builders? Ware spends a big chunk of her day looking at the environmental profile of each product. She constantly looks for new ways to reduce the carbon footprint of the products or offer products that allow customers to build in responsible ways. Sakrete reduced 5 percent of the carbon footprint of key products by simply altering the production method. The good news is that it is stronger, too!

"Once a company dissects what they offer their customers, they will find ways to save and improve all around," says Ware. "These benefits are passed on to the consumers, who, in turn, are more pleased with the brand. It's a positive regenerating cycle."

Case Study

Milwaukee Green Corridor Farmer's Market
Farmer's Market Plaza and Green Corridor bring rainwater management to Milwaukee

Functionally, the new 11,000-square-foot plaza in Milwaukee's Garden District serves as a farmer's market. Symbolically, it's the beginning of a much larger green movement in an evolving section of the city.

Completed this summer, the farmer's market really began three years ago, when Bryan Simon, owner of Simon Landscape Co. Inc., started Energy Exchange. The nonprofit educates the public about rainwater management and other green topics. Simon's vision included transforming a one-mile stretch of vacant or decaying spaces into a showcase of better management techniques in a city prone to overflowing storm sewers.

An alderman championed Simon's idea and expanded it with a resolution to create a 3.5-mile Green Corridor. Water-friendly upgrades, including permeable paving and bioswales, are popping up along the corridor, which also will serve as a testing ground for green technologies such as solar-powered signage and LED lighting.

Simon's own on-the-ground efforts started with a community garden on one end of the corridor with an adjacent farmer's market. The farmer's market features 66 10-X 10-foot stalls created using CalStar pavers in the autumn blend, laid in a basketweave pattern. Each booth is bordered by an eight-inch, dark gray soldier course. CalStar pavers in the tumbled natural color, arranged in a 90-degree herringbone pattern, create the eight-foot-wide aisles. Finally, the entire plaza is ringed by another dark gray soldier course.

"I was looking for a way to make our farmer's market unique and attract vendors and people," says Simon of his decision to make the pavers an integral part of the design. The booth layouts forgo any jockeying for position by vendors, provide clear delineation for patrons and provide aesthetic interest even when the vast space is not in use.

It took a crew of eight to 10 installers three weeks to place the nearly 65,000 pavers. In keeping with the corridor's water management goals, all water that falls on the plaza remains. The space is designed to direct water flow to one end, where it is captured and stored. In the future, the water will be recirculated through a planned water feature and also pumped for use in the community garden.

For the vehicular loading area, still under construction at the east end, Simon plans to install a four-foot strip of CalStar permeable pavers sandwiched between two, three-foot concrete bands.

The market, which also can be used for other community and private events, will connect to the garden via brick walkways that will meander through a plaza-wide pergola.

Along with aesthetics, the CalStar pavers add to the Corridor's sustainability story. The pavers are made using CalStar's proprietary manufacturing process that incorporates 40 percent local recycled material (fly ash, a byproduct from power plants) as the binder, which avoids the energy-intensive kiln firing required for clay pavers and the use of Portland cement contained in concrete pavers. This results in 85 percent less carbon emitted, and up to 85 percent less energy used for manufacturing. For this project, the manufacturer calculates that using 64,935 CalStar pavers, instead of traditional clay or concrete pavers, prevented nearly 25 tons of CO2 from being emitted, saved 32.5 million BTU of energy, and diverted 69 tons of waste from the landfill.

For more information, visit www.ca/starproducts.com.

Recycling

MUCH OF THE GREEN PRODUCT flood coming to market these days focuses on recycled content. A sustainability director knows to read these claims with an eye of caution. Ware believes that, generally, companies strive to do the right thing when including recycled content in their manufacturing process. But, sometimes, it takes more energy to make a product with recycled content than vir-


Ensuring Stability and Safety in Masonry Projects: Hog Leg, Hog Guard, and Hog Support
April 2025

As seasonal changes bring high winds and fluctuating temperatures, masonry projects face unique challenges. These conditions can stress vertical structures, requiring reliable bracing, while temperature swings may lead to a need for masonry restoration. A

What gives with head protection? Why workers want to keep their hard hats and ditch safety helmets.
April 2025

Last August, I took my pickup to the dealership for a nagging check engine light. While it was being looked over, I chatted with the salesman I normally deal with, and he told me about the latest and greatest 2025 models. He told me how the twin turbo inl

Government Affairs: Bringing North Carolina to Washington, D.C. and Hopefully Young People to Your Jobsites
April 2025

For you long time members of the Mason Contractors Association of America you likely remember our Annual Washington, D.C. Fly-In where MCAA members from around the country would come to Washington, D.C. meeting with Members of Congress from their home sta

Chairman's Message: While We Are Still Here
April 2025

I truly value my days working on construction sites during the summers of my high school and college days. Some moments in our youth are so clearly meaningful that we file them away in our subconscious to be recalled when life events require inspiration.